This week we were able to send off our NSF proposal! It took a lot of time and muscle, but we are very happy with how it turned out and look forward to seeing what comes of it.
During our meeting, we spent some time discussing how the proposal development process went before Dr. Thomas and Dr. Wallace (members of the Gemstone staff) came to sit in on our meeting. We gave them a general recap on our project and also updates on where we were with it. They were encouraging that we should begin to consider the end of our project, in that we may want to present at conferences or write an academic paper. It is certainly something to think about! All in all I think they were pleased with our progress, but there's still plenty to get cracking on.
With that, we turned our focus towards goals we still needed to complete, including looking into prototype materials and manufacturing; researching other markets where our product could have application; testing other PCMs; working on the COMSOL model/simulation; continuing the icebox experiments; and working on our thesis. I'm pretty stoked to see all of these things come together and can't wait to get a prototype going.
Next week we are foregoing our mentor meeting, since Dr. Shah has to be out, and we're going to do some serious work on these goals. Get excited!
-Kelly
P.S. Matt was awesome and updated our website - check it out!
http://teams.gemstone.umd.edu/classof2012/fresh/
This is the blog of Junior Gemstone Team FRESH, who are optimizing cold box design using PCM for more efficient vaccines transport to developing countries.
For more info on Team Fresh, visit their website
Sunday, February 20, 2011
Tuesday, February 15, 2011
Monday, February 14, 2011
Almost there...
The NSF proposal is in its home stretch. Team FRESH has done a phenomenal job pulling together experimental and theoretical data, devising a credible experimental plan, and emphasizing the public health relevance of their work. They've also described their outreach efforts with BCCHS and EHRS in excellent detail. The Team FRESH Blog even makes a couple of cameos!
This proposal will be competing with proposals from world-class research groups in bioengineering, mechanical engineering, and materials science... and I think it will hold its own.
Great work and good luck!
Sameer
This proposal will be competing with proposals from world-class research groups in bioengineering, mechanical engineering, and materials science... and I think it will hold its own.
Great work and good luck!
Sameer
Saturday, February 12, 2011
Feb. 10th Mentor Meeting
This week we focused on the NSF proposal. After our non mentor meeting, we sent our draft to Dr. Shah, which he edited and talked about at our mentor meeting. We still had to add the figures and some of the references. Dr. Shah stressed that the first two pages were essential in establishing what the project was about and why it is important. Therefore, we had to cut out most of the background part, and focus more on the scientific and societal significance. Then, we decided how we were going to go about editing the paper. We decided that we would edit in teams at different times, so each team would only have to look at one set of edits, instead of one person trying to compile four sets. The proposal must be submitted by Tuesday morning, so we planned to have it edited by the end of this weekend. After discussing the proposal, we took some time to talk about the overall structure for this semester. Every subgroup will update their progress weekly on the blog, even if they do not have anything substantial to report. Also, we have some icebox experiments scheduled to be done next week, and we are trying to update our literature review, as some articles on vaccine refrigeration have come out in the past few months. Next week is our meeting with Dr. Wallace and Dr. Thomas, so are going to spend some time next week preparing for that at our non mentor meeting.
Ravi Vaswani
Ravi Vaswani
Wednesday, February 9, 2011
Feb. 7th Nonmentor Meeting
At our Nonmentor Meeting this week, we focused on updating and editing our NSF proposal. We spent time working on writing our respective portions and adding in references as needed. We had to overhaul the basic structure of the proposal because it was not conveying what we wanted it to focus on. After we worked on it, it now emphasizes our experimental work, such as the modeling with COMSOL and the icebox experiments. At the end, we sent this version to Dr. Shah for his review and submission to the university. We are going to meet Thursday to finalize the proposal.
Ravi
Ravi
Thursday, February 3, 2011
FRESH Start!
Thanks to Divya who took the minutes before I arrived! The meeting was scheduled at the Engineering Building, not the Kim Building. Today, I learned that the Engineering Building is a part of the Math Building, and isn't in the Kim Building. Anyways..about our meeting!
Here's a brief recap of our meeting:
1) Outreach Program at BCC: Students interested in learning more about our project will get back to Amanda by February 15th, 2011 to determine when they can come and visit us.
2) NSF Proposal:
- Dr. Shah went over his edits and for our NSF proposal. The biggest problem was the little attention to scientific background, and too much justifications/broad impacts. We need more analysis on the technical components of our research, such as the implementation of the PCMs, geometry of integration of the ice box, and what is novel about what we are doing?
- We need to include references! Our rough draft only had three references. This is an anomaly from the other papers we've written which had more than enough.
- Dr. Hwang has agreed to put his name on our proposal. He will need to look over the paper before we submit it to NSF.
- We will be submitting our edited NSF proposal back to Dr. Shah by Tuesday, February 8, 2011.
3) Syllabus:
- Currently, we have very few goals after March. We must make it a priority to set more goals for the rest of the semester. By March 20th, 2011, we must set new goals for the semester.
- Marketing subgroup needs more goals. It should be their goal to add details of the marketing plan, such as finding a template.
- Blog Updates: The Minutes Keeper for the week posts minutes for both meetings and updates the blog. For subgroups, each member will rotate to see who posts on the blog that week.
- Attendance Policy: 2 excused/scheduled absences are allowed. If you are 20 minutes late, it counts as 1 unexcused absence
4) Deadlines:
- February 17,2011 - Finish the previous goals we have before Rebecca and Dr. Wallace (Gemstone staff) comes to visit
- March - Before the students from BCC come to visit, we must complete the goals regarding the icebox experiments. We want to share with the students the experiment experience we have.
- Spring Break - Prepare the end-of-the-semester deadlines, prepare to build the prototype, and finish writing parts of the Thesis so we can edit when we come back from break.
- April 22, 2011 - Undergraduate Research Day - Chance to share our research with the school
5) Miscellaneous
- Non-mentor meetings will take place on Tuesdays, from 10pm-11pm
- The Sensors Subgroup will change to the Materials/Building Subgroup
- Mentor Meetings will be at 3:45PM
This semester, we are hoping that there is more fluidity amongst the sub-groups. We want to make sure everyone everyone is participating. If you find yourself doing nothing, bring it up at the mentor/non-mentor meeting. We should all strive to do something to help our research progress.
Looking forward to a great semester!
-Young
Here's a brief recap of our meeting:
1) Outreach Program at BCC: Students interested in learning more about our project will get back to Amanda by February 15th, 2011 to determine when they can come and visit us.
2) NSF Proposal:
- Dr. Shah went over his edits and for our NSF proposal. The biggest problem was the little attention to scientific background, and too much justifications/broad impacts. We need more analysis on the technical components of our research, such as the implementation of the PCMs, geometry of integration of the ice box, and what is novel about what we are doing?
- We need to include references! Our rough draft only had three references. This is an anomaly from the other papers we've written which had more than enough.
- Dr. Hwang has agreed to put his name on our proposal. He will need to look over the paper before we submit it to NSF.
- We will be submitting our edited NSF proposal back to Dr. Shah by Tuesday, February 8, 2011.
3) Syllabus:
- Currently, we have very few goals after March. We must make it a priority to set more goals for the rest of the semester. By March 20th, 2011, we must set new goals for the semester.
- Marketing subgroup needs more goals. It should be their goal to add details of the marketing plan, such as finding a template.
- Blog Updates: The Minutes Keeper for the week posts minutes for both meetings and updates the blog. For subgroups, each member will rotate to see who posts on the blog that week.
- Attendance Policy: 2 excused/scheduled absences are allowed. If you are 20 minutes late, it counts as 1 unexcused absence
4) Deadlines:
- February 17,2011 - Finish the previous goals we have before Rebecca and Dr. Wallace (Gemstone staff) comes to visit
- March - Before the students from BCC come to visit, we must complete the goals regarding the icebox experiments. We want to share with the students the experiment experience we have.
- Spring Break - Prepare the end-of-the-semester deadlines, prepare to build the prototype, and finish writing parts of the Thesis so we can edit when we come back from break.
- April 22, 2011 - Undergraduate Research Day - Chance to share our research with the school
5) Miscellaneous
- Non-mentor meetings will take place on Tuesdays, from 10pm-11pm
- The Sensors Subgroup will change to the Materials/Building Subgroup
- Mentor Meetings will be at 3:45PM
This semester, we are hoping that there is more fluidity amongst the sub-groups. We want to make sure everyone everyone is participating. If you find yourself doing nothing, bring it up at the mentor/non-mentor meeting. We should all strive to do something to help our research progress.
Looking forward to a great semester!
-Young
First Non-Mentor of the New Semester!
All the members survived the "snowstorm," and we had our first non-mentor meeting for the new semester! As the semester begins, we immediately set out to work on our Gemstone project. The very first goal was to edit the syllabus for our team. Before we got started, we had to share some good news. We now own a Greenbox to run tests, and we found a group of students from Chevy Chase HS that are willing to come and visit us to gain some lab experience.
Some changes to the syllabus include:
- Reinstatement of the late fee. The penalty will be $0.25/min for a maximum of $5
- Every member is allowed two mentor/non-mentor schedule absences
- Keeping up with blogs
- The Minutes Keeper for the week is responsible for posting on the blog twice a week after the non-mentor, and mentor meetings.
- Each subgroup will update the blog after their meetings. Members in the subgroup will rotate to see who posts on the blog.
Expect a lot more of posts from Team FRESH!
-Young
Subscribe to:
Posts (Atom)